587 S Front Pictures 10-28-03 page 3

This picture shows trim work that has pulled away from the frame.  tie-down for hot water pan broken
Hot water heater and pan is now free of debris This pic is the space between the washer and the dryer.  The duct tape over the drain to keep debris out during construction is still in place.
This picture shows the shower door out of alignment for the master shower Picture shows the cracked mortar outside the window, upstairs, overlooking the courtyard
another view of the mortar crack at the window overlooking the courtyard Another casement window paint missing.  To see this the window must be opened, then the viewer needs to lean out and look back at the frame.
solid matter in the gutter Another casement window with missing paint
Some foreign matter, mortar or something, is on the lighter colored exterior wall between the railing and the window.